|
NewsInformation Center
Home>News > > 10 Steps to Setting Up a Zipper Testing Machine

10 Steps to Setting Up a Zipper Testing Machine

2023/03/15

Share: 

Share
The zipper test machine (zipper tester) is a piece of equipment designed to test the performance and durability of zips and zip products. It is used to measure parameters such as tensile strength, shear, fatigue, durability and electrode wear resistance of zips. zipper test machine usually consists of the main components such as test chamber, test fixture and screen display and is suitable for use in the textile, clothing and leather sectors.
 

The main functions of the zipper test machine are:

1. testing the tensile strength and shear strength of zips.
2. testing the number of openings and closings and fatigue resistance of zips
3. to test the fade resistance of zips
4. to test the breaking strength of zip fabric
5. testing the abrasion resistance of the zip's electrodes.

zipper
 

10 brief steps to set up the zipper test machine:

 
1. Switch on the zipper test machine and ensure that the power supply and electrical cables are not damaged.
2. Install the clamping device and the base to ensure the stability and safety of the tester.
3. According to the test requirements, select the appropriate test module and install it on the test machine, e.g. specify the number of openings and closings, the load and other parameters.
4. According to the length and type of zip under test, select the appropriate fixture and template to fix the zip under test.
5. Set the test parameters according to the test requirements, e.g. test time, test speed, load, etc.
6. Open the control panel of the tester and adjust the parameters of the tester according to the equipment manual and testing needs.
7. Make sure the safety door of the tester is locked to prevent the tester from accessing the moving parts of the machine in the test environment.
8. Calibrate the tester to ensure accurate test results, e.g. zero calibration in accordance with standard requirements.
9. Prepare to record and print test data log sheets and test reports, adding additional test conditions and criteria.
10. Start the test machine and begin testing, observing the test data log and test status, making adjustments to the test parameters if necessary, and finally stopping the test and dismantling the zipper test sample for physical and visual inspection.
 
The above are the general steps for setting up the zipper test machine, please refer to the zipper test machine operation manual for details. During the testing process, you need to strictly follow the test protocols, record the test data honestly and prepare the relevant standard documents and reports to ensure the authenticity, validity and repeatability of the test data.

Previous: How to Troubleshoot Common Zipper Testing Machine Issues?
 N e x t   : Apply These 5 Secret Techniques To Improve SINGLE YARN STRENGTH TESTER